Water Systems Master Plan (2022)
The 2022 Water Systems Master Plan (WSMP) includes the City’s three (3) water systems: Non-Potable Water (NPW), Potable Water (PW), and Recycled Water (RW) Systems. The most critical outcome of the 2022 WSMP is the development of comprehensive five-year and twenty-year capital improvement program (CIP) recommendations to improve distribution efficiency, reduce non-revenue water, and accommodate growth…
-
Wastewater Master Plan (2021)
The 2021 Wastewater Master Plan evaluates the operation and capacity of the existing wastewater collection system and wastewater treatment plant within the City of Redlands and makes recommendations for future system improvement. Wastewater Master Plan addresses the following key objectives: Develop a new collection system hydraulic model based on current flow and wastewater facilities data and confirm existing and…
-
Sustainable Mobility Plan (2021)
The Sustainable Mobility Plan (SMP) promotes citywide walking, biking, and transit connections for all residents, including communities that currently have limited access and choices. The SMP outlines a strategy that includes balancing street design for use by people, cars, bicyclists, children, seniors, and bus/rail users. The SMP coordinates with other City plans such as the…
-
2019 CIP Sewer Pipeline Replacement Project
The 2019 CIP Sewer Pipeline Replacement Project includes the rehabilitation and replacement of sewer pipelines at numerous locations throughout the City. The scope of work for the Project includes the removal and replacement of approximately 6,500 linear feet of 6 inch and 8 inch sewer pipeline, spot repairs, and manhole installations. Pipelines to be replaced…